Movable foot for mini-columns 1 and 2 compartments CV45 and 1 compartment CV80
Flush-mounting box for Pop up floor 2x3 modules, for installation in concrete floors
Installation kit for Pop up floor 2x3 modules
Internal angle for Snap-on DLP-S trunking 130x50mm
External angle for Snap-on DLP-S trunking 130x50mm
Flat angle for Snap-on DLP-S trunking 130x50mm
4 screws for height extension of the universal adjustable backbox up to 250mm.
Foam block for height extension of the universal adjustable backbox up to 250mm.
Installation kit for Pop up floor 2x4 modules
Pop up 2x3 modules to be equipped - matt aluminium finish
Incara Tower 120 equipped with 4 sockets SCH 2 USB chargers A+C 15W and 2m cord with plug
Incara Tower 60 equipped with 3 sockets SCH, 1 USB charger A+C and 2m cord with plug
Incara Tower 60 equipped with 3 sockets SCH, 1 USB charger A+C, 2 RJ45 CAT6 UTP and 2m cord with plug
Incara Tower 60 equipped with 4 sockets SCH, 2 RJ45 CAT6 UTP and 2m cord with plug
Incara Tower 60 equipped with 4 sockets SCH and 2m cord with plug
Incara Electr'On equipped with 1 USB charger A+C 15W, white cover 2,5m braided cord with plug
Incara Electr'On equipped with 1 USB charger A+C 15W, white cover 2,5m braided cord with plug
To assemble back box for screed floor to install a standard floor box capacity 8M vertical or 12M horizontal
To assemble back box for screed floor to install a standard floor box capacity 12M vertical or 18M horizontal
To assemble back box for screed floor to install a standard floor box capacity 16M vertical or 24M horizontal
Bend 90°curve for conduit Ø 25 mm
Bend 90° curve for conduit Ø 20 mm
Bend 90° curve for conduit Ø 32 mm